Canadian International School

The landscape construction works at Canadian International School included the preparation, installation and maintenance of both aquatic and terrestrial planting areas across the campus.

Client
Canadian International School
Project Type
Educational Institution
Project Status
Completed, 2020 – 2021
Landscape Consultant
Martin Lee Designs
Location
Jurong West, Singapore

Our scope included aquatic planting works, covering submerged, marginal and floating plants, together with site preparation and suitable soil and planting media. Terrestrial planting comprised shrubs, groundcovers and herbaceous plants, installed within prepared planting pockets. Subsoil drainage and pipework were also carried out to support effective water management within the landscape areas.

The works were completed with maintenance and establishment care to ensure the planted areas were properly established and ready for handover.

Scroll to Top